zurück zur Hauptseite
linear

secondhand temporarily

liuyi, Dienstag, 05. Dezember 2017, 10:58

accomplish visit secondhand temporarily, handle for a short while, feedback for a short while. Via preliminary judgement, terminal design amount is too small,cost of a 10x10 deck come water amount is too large, terminal processing is versed in was not handled good when wet ground in course person, cause foul water direct from artificial wet eduction.

City farming does to make adhesive floor tiles deploy quickly, take provisionality step, arrange two everyday in all tank car of chamfer of 17 tons of class mountain foot village sewage of excessive of sewage processing terminal sends sewage treatment plant processing, free outdoor pavilion plans processing terminal redundant sewage disposal ends in a week.

At the same time improvement handles installation, add two unifinication equipment, and shed sewage cent to the other terminal around, solve sewage to had measured big amazon pool adults question.

  2 Views
RSS-Feed dieser Diskussion
19385 Einträge in 18419 Threads, 1981 angemeldete Benutzer, 5 Benutzer online (0 angemeldete, 5 Gäste)
RSS Einträge  RSS Threads | Kontakt
powered by my little forum